Integrated Frame---1 Set of Pulp Barrel and Water Barrel
Integrated Frame
Model
Integrated Frame---1 Set of Pulp Barrel and Water Barrel
Scope of application
Terms of trade
Product Certification: GB
Warranty Period: 365days
Packaging Method: Other
Payment Method: TT/LC
Services: 365days
Delivery Time: 30days
Download PDF
Hebei Pantao Machinery Equipment Co., Ltd.
Membership category
Verified Supplier
Seller category
Machinery
1. Pulping System
Introduction :
Various waste paper raw materials are fed into the pulper. After about 40 minutes of high-consistency stirring, the pulp is automatically transported to the pulp supply tank for storage and agitation. It is then delivered by the pulp supply pump to the pulp conditioning tank, where it is stirred to the required pulp consistency. After that, the pulp is sent to the pulp supply tank and transferred to the molding machine via the pulp supply pump.