Equipment Introduction:
What are the components of a side-blowing integrated unit?
-
Side-blowing integrated unit: Controls the start and stop of the drying room, manages the temperature and humidity, and the dehumidification timing; provides thermal energy for material drying.
-
Polyurethane sandwich panel storage room, provides insulation for the drying room materials.
-
Air blower wall: Provides air energy for the drying room materials, removes moisture from the materials; removes heat from the main unit to increase or decrease the temperature of the drying room.
-
Air guide wall: Directs the air from the air blower wall to the front end, ensuring consistent air volume before and after the drying room, achieving the goal of evenly drying the materials.
