Lay the wire inside and outside the stage, hotel, exhibition hall, classroom, computer room.
Lay the wire in the market, superarket, writing building, the second decoration of the house.
Material warehouse, distributing center or other places with cars in and out.
The passage way in the workshop where there are forklifts come and across very often.
Terms of trade
Product Certification: ISO14001
Warranty Period: BILATERAL CONSULTION
Packaging Method: Plastic
Payment Method: TT/LC/CASH
Services: 365DAYS
Delivery Time: 30days
Download PDF
Chinese Mainland HQ
Membership category
Verified Supplier
Seller category
Machinery
Installation Guid Use special high sticky double-faced glue to fix the duct.e Clean the ground surface and the bottom surface of the duct before installatione The width of the special high sticky double-faced glue should be 12mm.e For easy to connect with the accessories, when use the double-faced glue to connect with the duct, the vacancy ofboth ends of the duct with 20-30 size should be 60mm at least; 100mm at least with 40-60 size of the duct; 150mmat least with 70 size of the duct, For example, if the length of 20x6 size of duct is 4m, then the lenath of the duct withdouble-faced glue should be 3.78m.
Advantages
Attracting appearance, compressure resistance, fire resistance, non-conductive, corrosion resistance.