FOODTECHX.COM
Please enter your keywords...
$160000
Inventory: 3

8-96 CAVITY Mineral water bottle preform mould machine

preform mould machine
Model
Scope of application
Terms of trade
Download PDF
Taizhou Huangyan Huadian Mould Co., Ltd.
Membership category
Verified Supplier
Seller category
Processing Manufacturer

The advantage on Hot Runner Technique

1. Reduce the wastage and cost of raw materials.
2. Reduce the work for recycle,classification,smash,dry,and store of waste, improve the work efficiency, save time and space.
3.Avoid to use the returned materials which will influence the quality of product.
4.Guarantee the product in the same quality level
5.Increase the injection volum,Improve the compressibiity of plastic melt
6.Intesify the injection function, improve the technique
7.Reduce the time of injection and pressure maintaining
8.Reduce Clamping force
9.Shorten Mold opening stroke of injection operation, Elimiate the time of taking out the Nozzle material
10.Shorten the injection cycle, improve the automation and work efficiency

Key Performance of Hot Runner System

1.Control the temperature of plastic melt precisely, Elimiate the degration of materials.
2.Naturally balanced runner desgin, Mold Cavity evenly filled.
3.Suitable size of Hot Nozzle can be sure the plastic melt mobile successfully and mold cavity are filled evenly.
4.Correct gate structure and size can guarantee the mold cavity evenly filled,Needle valve gate closed in time, to shorten cycle time.
5. No dead angle in runner, insure to change the color quickly, avoid materials degration.
6. Mininize Pressure lose
7. Pressure maintaining time is reasonable.

Cavity Perform Mold Size Mold Weight Cycle Time
Weight(g) Neck(mm) Height(mm) Width(mm)) Thickness(mm) (kg) (sec)
2(1*2) 720 55 470 300 608 330 125
4(2*2) 720 55 490 480 730 440 130
8(2*4) 16 28 450 350 410 475 18
12(2*6) 16 28 600 350 415 625 18
16(2*8) 21 28 730 380 445 690 22
24(3*8) 28 28 770 460 457 1070 28
32(4*8) 36 28 810 590 515 1590 28
48(4*12) 36 28 1070 590 535 2286 30
NO. Name Desciption Hardness
1 Mold base material P20 28-32
2 Core,cavity S136 48-52
3 Screw neck S136 48-52
4 Cooling mode Mold core, neck cooling
5 Cooling mode for core plate and cavity plate 1 in, 1 out
6 Out of center(MM) +/-0.08MM
7 Cycle injection time 8-23 Seconds
8 Delivery time 55 Days after desgins confirmed

 

Tell Us What You Need

Name
Telephone
Email
Message

Reply within 24 working hours.